Pan United Concrete

Pan United Concrete

Client

Pan United Concrete

Activities

  • Schedule shoot for 14 locations over 6 days
  • Photography + Editing

What’s interesting

A 6-day shoot, spreading over 14 different locations.

From construction sites, lab, to external and internal architecture.

Recce and intensive research needs to be done to acertain:

  • the best timing for the shoot based on the facing and direction of the projects.
  • the flow of sequence of locations to fully maximise the 6 days
  • if the project look better with or without the artificial light.